Share this
How to Choose a Builder (Without Losing Sleep or Money)
by Sean Hill on May 15, 2025
Hiring a builder is like choosing a climbing partner for a difficult ascent. It’s not just about who’s strongest or cheapest. It’s about who you trust to rope up with you and guide the project safely to the summit - your home, your business, your legacy.

Piling works underway on a residential site.
At RISE, we’ve worked with outstanding builders and learned (the hard way, at times) what separates the reliable from the risky. Here’s how to make sure you’re not just hiring a contractor - you’re choosing a collaborator.
Start With the People Behind the Name
A building company is only as good as the people running it. Ask:
-
Are they a registered limited company? This gives you a layer of protection and a paper trail. It also tells you they’ve made a commitment beyond the short term.
-
Have the directors ever folded a company before? One closure isn’t always a red flag - life happens. But if there’s a pattern, dig deeper.
-
Are they insured? If they don’t carry Public Liability, Employers’ Liability, Contractors’ All Risk, and Professional Indemnity - walk away. These are non-negotiable.
Look Beyond the Van and Hi-Vis
Great builders are often surrounded by quiet professionals who hold the build together. Ask who’s behind the scenes:
-
Do they have technical and admin support?
-
Is there a dedicated site manager, and can you meet them?
-
Are certified trades (electricians, gas engineers) on the team or subcontracted?
Knowing the team means knowing your risks - and your peace of mind.
Relationships Over Estimates
Builders often give you an estimate. That’s the easy bit. But what you need is trust - and a fixed price contract.
-
Get a written quote. It should include a fixed total, VAT, timescales, materials, and exclusions.
-
Scope of works. Make sure your architect reviews this. We often catch what others miss - incomplete specs, vague allowances, materials that don’t match the design intent.
-
Who’s buying what? Materials can be a minefield. Will they buy them? Will you? Are they sourcing from reputable suppliers?
A fixed quote built on vague assumptions is like building on sand. Clarity is the foundation.
Ask the Right Questions (Even If They Feel Awkward)
The best builders welcome your scrutiny - it shows you care. Ask:
-
Are you a member of a trade body? It’s not essential, but it does show professional pride and accountability.
-
Can I see your health and safety policy? You’d be shocked how many small firms wing this. Don’t let your site become a risk zone.
-
Will you provide a guarantee? And will it be insurance-backed if the company disappears?
If they dodge, deflect, or downplay - that’s your answer.
Check the Story Behind the Portfolio
Photos are one thing. Stories are another. When you’re shown past projects, ask:
-
Can I speak to two recent clients - and their architects?
-
What were the biggest challenges? How were they resolved?
-
Was the project delivered on time and on budget?
You’re not just looking for shiny finishes. You’re looking for character under pressure.
Don’t Build Without a Contract
This isn’t optional. A proper construction contract protects both sides.
-
Use a RIBA or JCT building contract. Not something downloaded off the internet.
-
Make your architect the Contract Administrator. We’ve seen too many clients try to mediate disputes between builder and designer. Stay out of the crossfire. Let us handle it.
Contracts clarify expectations. They don’t eliminate bumps in the road, but they do make sure everyone stays on the same map.
Timing Isn’t Everything - But It Matters
Ask when they can start. Then ask how long they’ll take. But also ask:
-
Are they trying to shoehorn you in between jobs?
-
Have they factored in weather, daylight hours, and delivery lead times?
We always recommend including start and end dates in the contract - along with provisions for delay. Realistic expectations are better than rosy ones.
The Best Builds Are Managed Twice
Every successful project we’ve delivered has had two key managers:
-
The builder’s site manager, running the show on the ground.
-
The architect as project manager, overseeing compliance, quality, and budget from above.
That combination is where the magic happens - collaboration, communication, and accountability.
Letting your architect lead the tender process is the surest way to avoid cowboy builders. We know how to spot red flags, how to test quotes, and how to set expectations early. It’s not just about finding the lowest bid - it’s about finding the best fit.
Final Thought: Hire Like You’re Building a Legacy
You’re not just hiring a builder. You’re investing in your future - one brick, one beam, one decision at a time.
Ask the awkward questions. Get it all in writing. And surround yourself with professionals who care as much about your project as you do.
That’s how you build something that lasts.
If you would like to talk through your project with the team, please do get in touch at architects@risedesignstudio.co.uk or give us a call on 020 3947 5886
RISE Design Studio Architects company reg no: 08129708 VAT no: GB158316403 © RISE Design Studio. Trading since 2011.
Share this
- Architecture (150)
- Sustainable architecture (110)
- Design (67)
- Passivhaus (59)
- Retrofit (55)
- London (51)
- Sustainable Design (50)
- New build (48)
- Renovation (43)
- energy (39)
- interior design (37)
- Building materials (33)
- Planning (33)
- Environment (31)
- climate-change (30)
- Inspirational architects (27)
- Refurbishment (27)
- extensions (27)
- Building elements (22)
- Inspiration (21)
- enerphit (21)
- Rise Projects (16)
- Extension (15)
- Innovative Architecture (13)
- net zero (13)
- Carbon Zero Homes (12)
- General (12)
- London Architecture (12)
- Philosophy (12)
- Working with an architect (11)
- RIBA (10)
- architects (10)
- Awards (9)
- Sustainable (9)
- Residential architecture (8)
- architect (8)
- Planning permission (7)
- low energy home (7)
- sustainable materials (7)
- Airtightness (6)
- Eenergy efficiency (6)
- Uncategorized (6)
- Virtual Reality (6)
- Costs (5)
- Passive house (5)
- RISE Sketchbook Chronicles (5)
- cinema design (5)
- construction (5)
- local materials (5)
- low carbon (5)
- sustainable building (5)
- ARB (4)
- BIM (4)
- Basement Extensions (4)
- Carbon Positive Buildings (4)
- House cost (4)
- concrete (4)
- constructioncosts (4)
- insulation (4)
- modular architecture (4)
- structural (4)
- structuralengineer (4)
- working from home (4)
- BIMx (3)
- Building in the Green Belt (3)
- Home extensions (3)
- Home improvement (3)
- Permitted development (3)
- Property (3)
- circular economy (3)
- furniture (3)
- mvhr (3)
- natural materials (3)
- plywood (3)
- sustainability (3)
- zero waste (3)
- 3D models (2)
- Artificial Intelligence (AI) (2)
- Bespoke lighting (2)
- Bricks (2)
- Commercial Architecture (2)
- Covid-19 (2)
- Feasibility Study (2)
- Furniture design (2)
- Heat Pumps (2)
- Loft conversion (2)
- Period Homes (2)
- Permitted development rights (2)
- Recycling (2)
- Roof extension (2)
- Social Distancing (2)
- Social housing (2)
- Welbeing (2)
- ashp (2)
- barcelona (2)
- building information modelling (2)
- building regulations (2)
- co-working (2)
- design&build (2)
- epc (2)
- glazed-extensions (2)
- green architecture (2)
- greenbelt (2)
- health and wellbeing (2)
- historic architecture (2)
- house extension (2)
- interiorfinishes (2)
- light (2)
- living space (2)
- london landmarks (2)
- londoncinemas (2)
- openingupworks (2)
- peter zumthor (2)
- project management (2)
- rammed earth (2)
- renewable energy (2)
- self build (2)
- sustainable structure (2)
- traditional (2)
- trialpits (2)
- waste (2)
- wooden furniture (2)
- #NLANetZero (1)
- 3D Printing (1)
- AECB (1)
- Adobe (1)
- Alvar (1)
- Architecture Interior Design (1)
- Architraves (1)
- Area (1)
- Art (1)
- Audio Visual (1)
- BREEAM (1)
- Birmingham Selfridges (1)
- Boat building (1)
- Boats (1)
- Brass (1)
- Brexit (1)
- Building energy (1)
- Casting (1)
- Chailey Brick (1)
- Chartered architect (1)
- Community Architecture (1)
- Contractor (1)
- Copper (1)
- Cornices (1)
- Czech Republic, (1)
- Data Centers (1)
- David Lea (1)
- Dormer extension (1)
- Ecohouse (1)
- EnvironmentalArchitecture (1)
- Fees (1)
- Flooding (1)
- Gandhi memorial museum (1)
- Garden studio (1)
- Green Register (1)
- Green infrastructure (1)
- GreenDesign (1)
- History (1)
- India (1)
- Jan Kaplický (1)
- Kitchen Design (1)
- L-shaped dormer (1)
- Land value (1)
- Lord's Media Centre (1)
- Mapping (1)
- Marseilles (1)
- Mary Portas (1)
- Metal (1)
- Micro Generation (1)
- Monuments (1)
- Mouldings (1)
- NPPF (1)
- Office to Homes (1)
- Paragraph 79 (1)
- Paragraph 80 (1)
- Party Wall Surveyor (1)
- PeopleFirstDesign (1)
- Place (1)
- Porch (1)
- Prefab (1)
- Procurement (1)
- ResilientFuture (1)
- Richard Rogers (1)
- Sand (1)
- Scandinavian architecture (1)
- Selfbuild (1)
- Skirting (1)
- Solar Shading (1)
- Spain (1)
- Steel (1)
- Surveying (1)
- Sustainable Lighting (1)
- Sverre fehn (1)
- VR (1)
- West london (1)
- Wildlife (1)
- Wood (1)
- architect fees (1)
- architectural details (1)
- arne jacobsen (1)
- avant garde (1)
- backland (1)
- basements (1)
- brentdesignawards (1)
- building design (1)
- built environment (1)
- carbonpositive (1)
- cement (1)
- charles correa (1)
- charles eames (1)
- charlie warde (1)
- charteredarchitect (1)
- climate (1)
- climate action (1)
- codes of practice (1)
- collaboration (1)
- country house (1)
- countryside (1)
- covid (1)
- dezeenawards (1)
- drone (1)
- eco-living (1)
- emissions (1)
- finnish architecture (1)
- foundations (1)
- futuristic (1)
- georgian architecture (1)
- glazed envelope (1)
- good working relationships (1)
- green building (1)
- hampstead (1)
- happiness (1)
- home extension (1)
- homesurveys (1)
- imperfection (1)
- independentcinemas (1)
- innovation (1)
- inspirational (1)
- internal windows (1)
- jean prouve (1)
- kindness economy (1)
- kintsugi (1)
- landscape architecture (1)
- lime (1)
- listed buildings (1)
- local (1)
- lockdown (1)
- mansard (1)
- manufacturing (1)
- materiality (1)
- modern architecture (1)
- moderninst (1)
- modernism (1)
- moulded furniture (1)
- natural (1)
- natural cooling (1)
- natural light (1)
- nordic pavilion (1)
- northern ireland (1)
- palazzo (1)
- placemaking (1)
- planningpermission (1)
- plywood kitchen (1)
- post-Covid (1)
- poverty (1)
- powerhouse (1)
- preapp (1)
- preapplication (1)
- ray eames (1)
- reclaimed bricks (1)
- recycle (1)
- reuse (1)
- ricardo bofill (1)
- risedesignstudio (1)
- rooflights (1)
- room reconfiguration (1)
- rural (1)
- satellite imagery (1)
- selfbuildhouse (1)
- shared spaces (1)
- site-progress (1)
- solarpvs (1)
- space (1)
- stone (1)
- structuralsurvey (1)
- sun tunnel (1)
- terraces (1)
- thegreenregister (1)
- totality (1)
- wabi-sabi (1)
- May 2025 (6)
- April 2025 (8)
- March 2025 (5)
- February 2025 (10)
- January 2025 (4)
- December 2024 (5)
- November 2024 (8)
- October 2024 (5)
- September 2024 (3)
- August 2024 (2)
- July 2024 (2)
- June 2024 (2)
- May 2024 (1)
- April 2024 (1)
- March 2024 (1)
- February 2024 (1)
- January 2024 (3)
- November 2023 (1)
- October 2023 (5)
- September 2023 (7)
- August 2023 (7)
- July 2023 (6)
- June 2023 (8)
- May 2023 (14)
- April 2023 (11)
- March 2023 (8)
- February 2023 (6)
- January 2023 (5)
- December 2022 (3)
- November 2022 (3)
- October 2022 (3)
- September 2022 (3)
- July 2022 (2)
- June 2022 (1)
- May 2022 (1)
- April 2022 (1)
- March 2022 (1)
- February 2022 (2)
- January 2022 (1)
- November 2021 (1)
- October 2021 (2)
- July 2021 (1)
- June 2021 (1)
- May 2021 (1)
- April 2021 (1)
- March 2021 (1)
- February 2021 (1)
- January 2021 (2)
- December 2020 (1)
- November 2020 (1)
- October 2020 (1)
- September 2020 (2)
- August 2020 (1)
- June 2020 (3)
- April 2020 (3)
- March 2020 (2)
- February 2020 (3)
- January 2020 (1)
- December 2019 (1)
- November 2019 (2)
- September 2019 (1)
- June 2019 (1)
- April 2019 (2)
- January 2019 (2)
- October 2018 (1)
- September 2018 (1)
- August 2018 (2)
- July 2018 (1)
- March 2018 (1)
- February 2018 (2)
- December 2017 (1)
- September 2017 (1)
- May 2017 (1)
- January 2017 (1)
- December 2016 (1)
- November 2016 (1)
- September 2016 (1)
- August 2016 (2)
- June 2016 (2)
- May 2016 (1)
- April 2016 (1)
- December 2015 (1)
- October 2015 (1)
- September 2015 (1)
- August 2015 (1)
- June 2015 (1)
- January 2015 (1)
- September 2014 (2)
- August 2014 (1)
- July 2014 (4)
- June 2014 (9)
- May 2014 (2)
- April 2014 (1)
- March 2014 (1)
- February 2014 (1)
- December 2013 (1)
- November 2013 (5)
- October 2013 (5)
- September 2013 (5)
- August 2013 (5)
- July 2013 (5)
- June 2013 (2)
- May 2013 (2)
- April 2013 (4)
- March 2013 (5)
- February 2013 (2)
- January 2013 (3)